Labconco Protecto Ech Filtered Fume Hoods 183 Series 8' Manuel d'utilisation

Page 89

Advertising
background image

Chapter 6: Maintaining the Protector Echo

Product Service 1-800-522-7658

83

Original instructions

Take your time to look it over and verify that all the connections are made
properly. Once you verify they are correct, move your ladder to the left and
connect the control module wires into the left side of fan #1. Also connect the air
tube coming from the control module back to the “T” on fan #1.

Step 15 – Recheck your connections

Check your work to ensure all connections are correct and fan placement is
correct.

You should have all of your fans installed based on your hood size, M2, M3, M4,
M5. Move your ladder and start at the left again, check your fans to make sure
that they are in their correct position based on the number you labeled earlier.

Example of a M3

Return to the control module and press

“OK”

to illuminate the screen. Then press

“OK”

again to go to the next step.

You will see:

[Partial Replacement]

Step #8

Reinsert your id card


Put your administrator card back in the holder and press

“OK”

to continue.


Step 16 – Enter your filter lifetime

You will now see:

[Partial Replacement]

Step #9

Enter filter lifetime

365 D
5 Min
730 Max


Put in the days as stated in your LP report or 730 for the 2 year maximum. Use
the arrow keys to enter the correct #.

Press

“OK”

to continue.


Press

“X”

to return to the previous menu.

Advertising