Labconco Protecto Ech Filtered Fume Hoods 183 Series 8' Manuel d'utilisation

Page 31

Advertising
background image

Chapter 3: Getting Started

Product Service 1-800-522-7658

25

Original instructions


Step 12 – Install air sampling tubing.

Slide the air sampling tubing onto fan #1. Put the small “t” onto the fan box and
run the other end over to the right to fan box #2.

Make sure the tubing is securely connected to each fan box. Repeat the step until
all fan boxes are connected together by the tubing.

Step 13 – Install electrical wiring to controller.

NOTE: This step was completed at the factory for your convenience but is
shown for maintenance purposes.

Inlet wiring to

power control

panel, fans,

and lights

Junction box

(incoming

power may be

hard wired)

Outlet wiring

to power up

control panel

and fans and

lights

Advertising