Labconco Protecto Ech Filtered Fume Hoods 183 Series 8' Manuel d'utilisation

Page 22

Advertising
background image

Chapter 3: Getting Started

Product Service 1-800-522-7658

16

Original instructions

fixtures supplied on your laboratory hood are designed for use with the following
services:

Air

Hot Water

Vacuum

Cold Water

Natural Gas – See caution below

WARNING: Contact Labconco Customer Service directly
before using any service other than those listed above in these
valves to assure full compatibility.

AVERTISSEMENT : Contacter le Service Clientèle de
Labconco directement avant d'utiliser n'importe quel service
autre que ceux énumérés au-dessus dans ces soupapes pour
assurer une pleine compatibilité.

CAUTION: Natural gas should be used only in the service
fixture that has been pre-plumbed with brass tubing. Sulfur
content of the gas could cause deterioration of standard copper
supply lines.

PRUDENCE : Le gaz naturel devrait être seulement utilisé
dans l'accessoire de service qui a été pré soudé avec des tuyaux
de cuivre. Le contenu soufré du gaz pourrait causer la
détérioration des lignes d’alimentation en cuivre standard.

Sealing the Protector Echo Hood to the

Work Surface


When the filtered hood has been set in place, ducted, wired, and plumbed, it
should be sealed at the work surface to prevent spilled materials from collecting
under the walls of the hood. Materials such as silicone sealants are recommended
to seal the hood structure.

Setting Up the Protector Echo Floor-Mounted

Filtered Hood


Specific instructions are detailed in Appendix J to assemble and maneuver the
Protector Echo Floor-Mount into your laboratory.

!

!

Advertising