Chapter 3: Getting Started

Product Service 1-800-522-7658

18

Original instructions

left to right facing the superstructure, fan 1 will be to the left, then 2, 3, 4,
and 5 to the right depending on the size.

5.

Each Protector Echo Hood will have the following Neutrodine filters

based on their size per each hood installed.

M2 (2 column filtration) 4 total Neutrodine filters

M3 (3 column filtration) 6 total Neutrodine filters

M4 (4 column filtration) 8 total Neutrodine filters

M5 (5 column filtration) 10 total Neutrodine filters


Step 2 – Locate cardboard box on the pallet, the controller on the front
header, the temperature sensor inside the hood, and the sash sensor on the
left side.

For your convenience, the cardboard box on the pallet contains the operational
cards to run the hood along with the modular fan and light harnesses and air
sampling tubing. Please locate these now. Then locate the pre-mounted controller
on the front header, the temperature sensor inside the hood, and the sash sensor on
the left side of the hood. These components have been pre-mounted for
convenience.

Step 3 – Unpack all the filters.

Unpack all of the Neutrodine filters for the hood you are commissioning. The
Neutrodine filters are shipped separately from the filter manufacturer to your job
site. Remove all packing material, lay them flat and stack them out of the way of
the front of the superstructure but near it.

Step 4 – Unpack lights, put up gutters, light box and pre-filters.

The fan and light boxes will have a number that corresponds to their position on
the superstructure.

***Their position is important as the micro switch settings are preset prior to
shipment. Otherwise you will have to adjust them before powering up the
controller.***

Start from the left facing the front of the superstructure. The first box to open will
have a 1 on it. That will be the one that will be installed on the far left on top of
the superstructure.

On the top of the opened box you will find a rectangle “gutter.” Place that on top
of the superstructure first.

With gutter on, next put up the light out of that same box. Make sure that the
edge of the light box is properly seated into the foam of the gutter on all sides.

Now make sure the light has a white pre-filter inside the light box itself.