Low profile termination installation – John Wood Envirosense Power Direct Vent (May 2010 or later) Manuel d'utilisation

Page 35

Advertising
background image

35

LOW PROFILE TERMINATION INSTALLATION

This water heater is certified for sidewall direct venting with IPEX

System 636 Low Profile Vent Kit. Follow instructions below for proper

installations.
All termination kits must be located and installed in accordance with

local codes or the current editions of the CAN/CSA-B149.1, the Natural

Gas and Propane Installation Code.
1. Once the proper location has been determined, cut 2 holes in the

wall large enough to accomodate the pipe. Pipe diameters and

distance between hole centers can be found in Table 9.

2. Slide both the intake and exhaust pipes through the holes. Solvent

cement both pipes to the base of the vent termination kit, follow the

solvent cementing procedures outlined in the IPEX System 636

Installation Guide, which is available on the web www.ipexinc.com.

3. To fasten the Base to the wall, use the supplied screws and anchors.

A 3/16” (5mm) hole, 1-3/16” (30mm) deep, will need to be drilled for

the anchors. Locate the anchor hole using the base as a template.

4. Screw the Cap to the Base using the supplied screws.
5. Once the vent termination and pipes are secured, the wall

penetrations will need to be sealed from the interior using a PVC-

compatible sealant material.

6. All vent pipes and air inlets must terminate at the same height to

avoid possibility of severe personal injury, death, or substantial

property damage.

8. Operate heater through 1 heat cycle to ensure combustion-air and

vent pipes are properly connected to concentric vent termination

connections.

Figure: 32

Vent Base

Vent Cap

Air Piping

Vent Piping

Table 9

Low Profile Termination Kits - Dimensions

AOS Kit

Number

IPEX Part

Number

Description

Pipe Outside

Diameter

Hole Spacing

(ctr to ctr)

327479-000

196984

2” Flush Mount Vent Kit

2.375”

5.6”

327478-000

196985

3” Flush Mount Vent Kit

3.5”

5.6”

Table 10

Each Kit Contains

Qty

Item Description

1

Base (two holes)

1

Cap (one hole)

8

Stainless Steek Screws

4

Plastic Anchors

To Boiler Intake

Air Connection

From Boiler Vent

Pipe Connection

Vent/Air

Termination

12”

Min to

Over-

Hang

12”

Min

Grade or

Snow Line

Possible Orientations

12” Min between Edge of Air

Inlet and Adjacent Vent Outlet

Air

Vent/Air

Termination

Vent

Figure: 33

Figure: 34

Advertising