INSTALLATION CHECKLIST
Note: Use and complete this checklist before lighting the
heater. Correct any conditions that do not meet these
instructions.

Water Heater Location

Centrally located with the water piping system.
Located as close to gas piping and vent pipe system
as possible.

Located indoors and in a vertical position. Protected
from freezing temperatures.

Proper clearances from combustible surfaces
maintained and not installed directly on a carpeted
floor.

Provisions made to protect the area from water
damage. Metal drain pan installed and piped to an
adequate drain.

Installation area free of corrosive elements, flammable
material and flammable vapour emitting products.

Sufficient room to service the water heater.

Gas Supply and Piping

Gas supply is the same type as listed on the water
heater data plate.

Gas line equipped with shut-off valve, union and
sediment trap.

Adequate pipe size and of approved material.

Approved pipe joint compound or tape used.

Chloride-free soap and water solution or other
approved means used to check all connections and
fittings for possible gas leaks.

Vent Pipe System

Evenly stretched out between water heater and vent
termination hood.

Smooth bend with adequate support to prevent
sagging, 6.4mm per 305mm (0.25” per foot).

Inside pipe (3”) and outside pipe (6”) securely
fastened to vent termination hood.

Vent restricter plate installed on heater flue outlet as
applicable.

Inside pipe (3”) and outside pipe (6”) securely fastened
to water heater with silicone and gear clamps.

Not obstructed in any way.

Vent Termination Hood

Securely fastened to exterior wall.

Above anticipated snow level or 305mm (12”) above
grade.

Proper clearances from windows, doors, corners,
other vent openings etc.

Area around vent termination hood clear and
unobstructed.

No flammable vapour emitting products stored nearby.

Safety covers in place (when applicable).

Water System Piping

Temperature-Pressure relief valve properly installed
with a discharge line run to an open drain and
protected from freezing.

All piping properly installed and free of leaks.

Heater completely filled with water.

Closed system pressure build-up precautions installed.

Mixing valve installed (when applicable).

After all actions on checklist are checked/

completed, read the Lighting Instructions and

proceed with lighting the heater.