GE Industrial Solutions Entellisys Low Voltage Switchgear Manuel d'utilisation
Page 41

Entellisys Low Voltage Switchgear
41
closed. This test should be performed with a
1000 volt megger. Disconnect all control circuits
before checking resistance.
3. Check for secure mounting and wiring connections
at Entellisys instrumentation.
4. Using the Entellisys HMI, exercise all
EntelliGuard breakers to determine all
devices work correctly. See DEH-501 for
instructions on using the Entellisys HMI.
5. Test all protection functions using the
Entellisys System Test Kit. See DEH-233 for
instructions.
6. Make certain that field wiring is clear of live
bus and, where necessary, physically
secured to withstand the effects of fault
currents.
7. Check to determine that all grounding
connections are made properly.
8. Remove all debris, scrap wire, etc., from the
switchgear interior before closing the
enclosure.
9.
Install covers, close doors, and make certain
that no wires are pinched and that all
enclosure parts are properly aligned and
tightened.