Equipment shipping sections up to 10 feet long will be fastened

to the skids with four lag screws, one in each corner. The
shipping skid and lag screws are expendable material and may

be disposed of at the purchaser's discretion.

3. FASTEN SECTIONS TOGETHER-After placement of the

equipment and installing the anchor bolts loosely, the

various shipping sections must be rigidly fastened
together. Through-bolts fasten each section of the

switchgear equipment to the adjacent section. Figure 4-6
shows the location of the through-bolts.

Fig. 4-6. Location of through-bolts, see Fig. 4-7 (dimensions in

inches)
Figure 4-7 illustrates the installation of the through-bolts. The

through-bolts are in the front and rear compartments. The nut

and bolt assembly should be tightened with a torque of 25-30 ft-
lbs.

Fig. 4-7. Through-bolt installation

All of the hardware required for assembling the equipment
across the shipping splits is furnished with the equipment. If a

transformer is included in the line-up of equipment, the

transformer flange should be aligned with the opening in the side
of the transition section and fastened together using the 3/8-16

bolts, nuts and washers supplied with switchgear. The fastener

assembly should be tightened with a torque of 25-30 ft-lbs.

4. COMPLETE THE ELECTRICAL INTERCONNECTIONS - After

completing the mechanical connections between the

several sections of equipment, the electrical
interconnections should be completed. This includes the

installation of the main bus bars, and the splice plates for

the neutral bus, and the ground bus in addition to the
control and metering circuits.

WARNING: All switchgear equipment must be adequately
grounded for safety. Failure to ground equipment properly

may result in serious injury.

ADVERTISSEMENT: Tout l’équipement du dispositif de
commutation doit être mis à la terre adéquatement de

manière sécutaire. Des blessures sérieuses peuvent survenir si
l’on omet de mettre l’équipement à la terre correctement.


Figure 4-8 illustrates the general location of the buses that must

be spliced across the shipping splits.

Fig. 4-8. Typical location of buses at shipping split