Entellisys low voltage switchgear – GE Industrial Solutions Entellisys Low Voltage Switchgear Manuel d'utilisation

Page 33

Advertising
background image

Entellisys Low Voltage Switchgear

33

The hoist should be lifted into position on top of the switchgear so

that the end with two rollers is toward the rear of the equipment,

Fig. 4-22.

Fig. 4-22. Location of hoist rear rollers

The rear wheels can then be hooked under the channel and the
front wheels can be positioned on the front track. See Fig. 4-23.

The runner guide at the rear should then be reassembled, Fig. 4-24.

Stop blocks are provided at each end of the front track to prevent
the hoist from rolling off the ends of the track.

Fig. 4-23. Front rollers positioned on front track

Fig. 4-24. Replacing the runner guide after completion of hoist

installation

Fig. 4-25. Removing the bracket locking the hoist dolly

If the equipment has been shipped in sections, fig. 4-26, there are

splice plates for the runner guide and hoist rail attached to each

respective part.

Advertising