Maintenance – Lincoln Electric COMMANDER 400 SVM133-B Manuel d'utilisation

Page 43

Advertising
background image

COOLING SYSTEM: The cooling system of the Deutz
engine needs to be checked and cleaned periodically.
Consult the engine Operation Manual for the proper
frequency and procedure.

COOLING BLOWER BELT: The following procedure
should be followed to replace the cooling blower belt:

1. Allow the machine to cool.

2. Unfasten and slide the battery holder out from the

welder.

3. Disconnect the negative battery cable.

4. Remove the engine end panel for access to the

engine.

5. See Figure D.4. Loosen the alternator mounting

bolts (1, 2, 3) and rotate the alternator toward the
engine.

6. Remove the old cooling blower belt and install a new

one.

7. Push outward on the alternator (4) and adjust the

cold belt tension to 63-73 lbs. (10-15 mm maximum
deflection) midway between any two pulleys.
Tighten bolts (1), (2), (3).

8. Reinstall the engine end panel. Reattach the nega-

tive battery cable. Slide in and refasten the battery
holder.

9. Check the cooling blower belt tension after 100

hours of operation.

MAINTENANCE

D-7

D-7

COMMANDER 400

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

FIGURE D.4 – COOLING BLOWER BELT REPLACEMENT AND ADJUSTING

1

2

4

3

Advertising