Perform the shunt calibration test, Also, perform the shunt calibration test, Shunt calibration test – Lincoln Electric COMMANDER 400 SVM133-B Manuel d'utilisation

Page 115: Troubleshooting & repair, Warning

Advertising
background image

SHUNT CALIBRATION TEST

Service and repair should be performed by only Lincoln Electric factory trained personnel.
Unauthorized repairs performed on this equipment may result in danger to the technician or
machine operator and will invalidate your factory warranty. For your safety and to avoid
electrical shock, please observe all safety notes and precautions detailed throughout this
manual.

If for any reason you do not understand the test procedures or are unable to perform the
test/repairs safely, contact the Lincoln Electric Service Department for electrical
troubleshooting assistance before you proceed. Call 1-800-833-9353 (WELD).

DESCRIPTION

This test will determine whether the 600 amp shunt is out of calibration.

MATERIALS NEEDED

5/16” Nut Driver

Multi-Meter

Resistive Grid Bank

Commander 400 Wiring Diagram (See the electrical diagrams section of this manual)

Control PC Board Layout (See the electrical diagrams section of this manual)

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

TROUBLESHOOTING & REPAIR

WARNING

This procedure takes approximately 40 minutes to perform.

F-61

F-61

COMMANDER 400

Advertising