Troubleshooting & repair, Scr removal and replacement (continued) – Lincoln Electric COMMANDER 400 SVM133-B Manuel d'utilisation

Page 153

Advertising
background image

TROUBLESHOOTING & REPAIR

F-99

F-99

COMMANDER 400

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

SCR REMOVAL AND REPLACEMENT

(continued)

CLAMPING PROCEDURE
FOR 1/4-28 CAP SCREWS

NOTE: This procedure can only be used with 1/4-
28 cap screws.

Do not use cap screws with any other type thread
or new SCR will be damaged.

Do not over tighten cap screws. The leaf spring
will apply the required clamping force to the SCR.

1.

Do not turn the nuts. While holding the nuts
stationary, turn the cap screws only with the
following procedure.

2.

Tighten first cap screw 1/4 turn.

3.

Tighten second cap screw 1/2 turn.

4.

Tighten first cap screw 1/2 turn.

5.

Tighten second cap screw 1/2 turn.

6.

Tighten first cap screw 1/4 turn. STOP.

7.

Assembly now has the proper clamping force.

8.

Perform the Active SCR Test.

CLAMPING PROCEDURE
FOR 1/4-20 CAP SCREWS

NOTE:

This procedure can only be used with

1/4-20 cap screws.

Do not use cap screws with any other type thread
or new SCR will be damaged.

Do not over tighten cap screws. The leaf spring
will apply the required clamping force to the SCR.

1.

Do not turn the nuts. While holding the nuts
stationary, turn the cap screws only with the
following procedure.

2.

Tighten first cap screw 1/4 turn.

3.

Tighten second cap screw 1/2 turn.

4.

Tighten first cap screw 1/2 turn.

5.

Tighten second cap screw 1/2 turn.

6.

Tighten first cap screw 1/4 turn. STOP.

7.

Assembly now has the proper clamping force.

8.

Perform the Active SCR Test.

Advertising