Mise en route / start-up – Sulky Polyvrac XT Manuel d'utilisation
Page 23

21
FR
GB
Mise en route / Start-up
Fitting the spreading mechanism:
- Position the spreading mechanism using a fork lift
truck.
- Insert the cross member in the clevises
on the
lower brackets on the spreader chassis.
- Pin the clevises
behind the cross member.
- Raise the spreading mechanism
until its top
surface comes into contact with the underside of
the belt drive housing.
- Attach the support bars
, tighten them slightly
by turning the cross member and tighten the
locknut.
- For the disc mechanism, fit the feed unit
(4
bolts).
- Fit the spreading mechanism drive shaft.
- For the auger boom, position the hydraulic
cylinders and connect the hydraulic lines
When the booms are folded up, check that
they are properly secured.
5
5
4
4
3
3
3
3
2
2
1
1
D
D
1
1
Montage du dispositif d’épandage:
- Positionner le dispositif d’épandage à l’aide d’un
chariot élévateur à fourches.
- Engager le tube transversal dans les mâchoires
des supports inférieurs solidaires du châssis de
l’épandeur.
- Goupiller les mâchoires
derrière le tube
transversal.
- Relever le dispositif d’épandage
jusqu’à ce
que sa face supérieure soit au contact avec le
dessous du support d’entraînement du tapis.
- Accrocher les suspentes
, les tendre
modérément en tournant le tube, serrer le contre-
écrou.
- Pour le dispositif à plateaux mettre en place le
boîtier
de descente (4 boulons).
- Mettre le cardan d’entraînement du dispositif
d’épandage.
- Avec la rampe à vis positionner les vérins
hydrauliques et effectuer les branchements
hydrauliques
Lorsque les rampes sont repliées, vérifier
qu’elles sont parfaitement verrouillées.
5
5
4
4
2
2
1
1
3
3
3
3