Rinnai Q130SN Manuel d'utilisation

Page 29

Advertising
background image

Installation & Servicing Instructions Rinnai Q-Series

29

6.7 Vent system and air supply system

Provisions for combustion and ventilation air must be made in accordance with section,
Air for Combustion and Ventilation of the National Flue Gas Code, ANSI Z223.1,
or Sections 7.2, 7.3 of 7.4 of CAN/CGA B149.1, Installation Codes, or applicable
provisions of the local building codes.

- Do not store chemicals near the boiler or in rooms where the air is being supplied

to the boiler.

See the list on page 10.

- Do not allow the flue gases of other appliances to enter the boiler.
- Keep cabinet free of moisture

In the event that the system has actuated to shut off the main burner gas, do

not attempt to place the boiler in operation. Contact a qualified service agency.

6.7.1

Intake / Exhaust Guidelines

Refer to the specific instructions on your vent product for additional installation
requirements.

• For direct vent boilers, proper reassembly and resealing of the vent-air intake

system.

• You must use vent components that are certified and listed with this model.

• Do not combine vent components from different manufacturers.

• Venting should be as direct as possible with a minimum number of pipe fittings.

• Avoid dips or sags in horizontal vent runs by installing supports per the vent

manufacturer’s instructions.

• Support horizontal vent runs every four feet and all vertical vent runs every six

feet or in accordance with local codes.

• Vent diameter must not be reduced.

• The boiler is unsuitable to install on a common vent installation, see also chapter 20.

• Do not connect the venting system with an existing vent or chimney.

• Do not common vent with the vent pipe of any other water heater or appliance.

• Vent connections must be firmly pressed together so that the gaskets form an air

tight seal.

• Refer to the instructions of the vent system manufacturer for component assembly

instructions.

• If the vent system is to be enclosed, it is suggested that the design of the enclosure

shall permit inspection of the vent system. The design of such enclosure shall be
deemed acceptable by the installer or the local inspector.

If it becomes necessary to access an enclosed vent system for service or

repairs, Rinnai is not responsible for any costs or difficulties in accessing

the vent system. Warranty does not cover obtaining access to an enclosed

vent system.

The instructions for the installations of the venting system shall specifiy that the
horizontal portions of the venting system shall be supported to prevent sagging; the

methods of and intervals for support shall be specified. These instructions shall also
specify that the venting system:

• For category I, II and IV boilers, have horizontal runs sloping upwards not less

than 1/4" per foot (21mm/m) from the boiler to the vent terminal;

• For category III boilers, slope shall be as specified in the boiler manufacturer's

instructions;

• For category II and IV boilers, be installed so as to prevent accumulation of con-

densate; and

• For category II and IV boilers, where necessary, have means provided for drainage

of condensate.

NOTICE

i

NOTICE

i

Advertising
Ce manuel est liée aux produits suivants: