Rinnai Q130SN Manuel d'utilisation

Page 11

Advertising
background image

Installation & Servicing Instructions Rinnai Q-Series

11

5.2 Fitting the boiler

-

Remove the packaging materials.

- Do not tear the packaging. Take notice of the presence of the mounting

template at the inside of the carton wrapper.

- Lay the boiler on its back during unpacking. When unpacking, the casing can

be removed from the boiler. This part can be kept apart during installation. It

must be placed on the boiler and fixed with the screw behind the door before

the boiler is started up.

Turn the boiler to its side and remove the wall bracket from the back of the

boiler by removing the 2 screws.

The boiler can be mounted practically to any wall with the suspension bracket and the
enclosed mounting equipment.

- The wall must be flat and of sufficient strength in order to be able to securely hold

and support the boiler weight with its water content.

- Take note of the necessary space around the boiler for installation of venting

system, pipework and servicing. See drawing on pages 12 to 15.

The location of the boiler can be determined by using the template which is printed
on the inside the boiler package wrapping. Remember to account for the spacing of
the plumbing kit.

-

Drill the necessary holes using the template

-

Install the mounting bracket to the wall using the supplied mounting materials

Lifting and carrying precautions.

To avoid personal injury please follow these recommendations:

- Always lift the boiler with 2 people or use special equipment.

- When lifting the boiler, bend the knees, and keep the back straight and feet

apart.

- Do not lift and twist at the same time.

- Lift and carry the boiler close to the body.

- Wear protective clothing and gloves to protect from any sharp edges.

Lift the boiler only by the boiler's rear wall.

-

Dispose the packaging materials.

!

CAUTION

NOTICE

i

NOTICE

i

!

WARNING

Advertising
Ce manuel est liée aux produits suivants: