12. If the installation is a zone system be sure to purge out each zone individually.
13. Close the auto feed on the system (F1).
14. Close the return side purge station (BD2) and disconnect the hose (H3).
15. Open the main valve on the system return (V3).
16. Open shutoff valves on both the supply and return connections on the plumbing

kit (V1 and V2).

17. Clean out the dirt trap.

18. Test the pH of the water that will be used for filling the system.

19. Test the water hardness of the water that will be used for filling the system.
20. Use the proper water treatment to ensure the pH and water hardness are within

the Rinnai boiler water quality guidelines.

21. The boiler and system may now be filled.

The following is a list of approved system cleaners, inhibitors, and antifreeze.

Approved antifreeze:
- Rhomar RhoGard Mutli-Metal (AL safe)

- Noble Noburst AL

Approved system cleaner:
- Noble Noburst Hydronic System Cleaner
- Fernox F3 Cleaner
- Rhomar Hydro-Solv 9100

The system cleaners from NoBurst, Rhomar, and Fernox are not to be used in

the boiler. The boiler must be closed off (valved off) from the rest of the system

or not connected while the cleaners are in the system. The system should then

be drained and then thoroughly flushed with clean water to remove all the sy-

stem cleaner.

Approved inhibitors:
- Rhomar Pro-tek 922

- Noble Noburst AL inhibitor

- Connect the expansion tank to the system. See chapter 6.2.
- Connect the pipes so that they are free from strain.

Connecting boiler with DHW tank

- Connect the external DHW tank according to the installation instructions of the

DHW tank and fittings concerned. See chapter 7 and the Rinnai Boiler Applications
Manual for additional information.