sedIMent traps

A sediment trap should be installed as close to the inlet of the water

heater as practical at the time of water heater installation. The

sediment trap should be either a tee fitting with a capped nipple

in the bottom outlet or other device recognized as an effective

sediment trap. If a tee fitting is used, it should be installed in

conformance with one of the methods of installation shown in

Figures 12 and 13.

Contaminants in the gas lines may cause improper operation of

the gas control valve that may result in fire or explosion. Before

attaching the gas line be sure that all gas pipe is clean on the inside.

To trap any dirt or foreign material in the gas supply line, a drip leg

(sometimes called a sediment trap) must be incorporated in the

piping. The drip leg must be readily accessible. Install in accordance

with the “Gas Piping” section. Refer to the current edition of the

Natural Gas and Propane Installation Code (CAN/CSA B149.1).

FIGURE 14.

fIllInG the water heater

Never use this water heater unless it is completely full of water.

To prevent damage to the tank, the tank must be filled with water.

Water must flow from the hot water faucet before turning “ON” gas

to the water heater.

To fill the water heater with water:

1. Close the water heater drain valve by turning handle to the right

(clockwise). The drain valve is on the lower front of water heater.

2. Open the cold water supply valve to the water heater.

note: the cold water supply valve must be left open when

the water heater is in use.

3. To insure complete filling of the tank, allow air to exit by opening

nearest hot water faucet. Allow water to run until a constant flow

is obtained. This will let air out of the water heater and the piping.

4. Check all water piping and connections for leaks. Repair as needed.

vent pIpe asseMBlY

There are three parts of the vent pipe assembly that connect the

water heater exhaust (located on lower back side of water heater)

to inlet of the blower assembly (mounted on top of water heater) as

shown in Figure 1. These parts will need to be assembled according

to these instructions.

Assemble Vent Pipe Assemblies #1, #2 and #3 (See Figure 1) prior

to cementing. The preferred orientation of Vent Pipe Assembly #1

(Condensate U-Assembly) is shown in Figure 16. However this

assembly may be rotated to a different orientation as needed for the

specific installation requirements. Note the rotational orientation of

each part by marking a line several inches long across the joints.The

long tube of Vent Pipe Assembly #2 should be approximately vertical.

If it is found that either of the two pieces of pipe in Vent Pipe Assembly

#2 are too long for proper fit-up, then remove as little material as

possible to improve the fit-up. Keep in mind that the pipes will insert

slightly further into the elbows when cement is applied as it acts as

a lubricating agent. The vertical distance from the bottom of the

Condensate U-Assembly to the floor that supports the water heater

should be approximately 0.25” (0.64 cm), see Figure 16. Disassemble

the parts and cement back together using the alignment marks. After

the cement dries, attach the assembly to the blower and the water

heater exhaust using the supplied rubber boots and hose clamps.

A condensate trap is incorporated in the bottom of this vent pipe

assembly. See the CONDENSATE section of this manual for further

details.