GE Industrial Solutions AKD-20 Low Voltage Switchgear Manuel d'utilisation

Page 35

Advertising
background image

AKD-20 Low Voltage Switchgear
Chapter 4. Equipment Installation

35

©2012 General Electric All Rights Reserved

The ground bus is mounted directly on the rear upright channels.

NOTE: It is particularly important that the ground bus be

connected first since it provides an integral ground for all the

equipment. It must also be connected to the station ground prior

to proceeding with the installation.

NOTE: Il est particulièrement important que la barre omnibus de

mise à la terre soit branchée en premier, étant donné qu’elle

fournit une mise à la terre intégrale à tout l’équipement. Elle doit

aussi être branchée à la mise à la terre du poste avant de

procéder à la installation.

A 4/0 AWG cable connector is located in the bottom of the transition

section (or in the incoming line compartment if a transition section

is not included) for terminating the purchaser's cable connection to

ground. The specific location of the station ground connection is

shown on the site floor plan drawing and in the electrical drawings

supplied with the equipment. All grounding of the switchgear

should be in accordance with National Electrical Code.

Fig. 4-11. Plan view of ground bus splice installation


Figure 4-11 illustrates the installation of the ground bus splice plate

across a shipping split. In addition to the bolted fastening of the

splice plate to the two ends of the ground bus, self-tapping 1/4-20

bolts pass through the splice plate and ground bus stubs, and

thread into the equipment frame. These bolts should be fastened

with a torque of 7-9 ft-lbs.

If a GE transformer (rated above 750 kVA) is present in the line-up, a

ground bar located in the transition compartment, Fig. 4-12, is

provided for connection of the transformer ground pad to the

equipment ground termination point.

Fig. 4-12. Flange opening on a transition section to a GE

transformer

As shipped, the ground bar is mounted so it does not protrude

beyond the outer surface of the equipment. When the equipment is

installed in its final location, the ground bar must be reassembled

using the outer bolt holes in the horizontal ground bus spanning the

width of the transition compartment. In this mounting location, the

offset portion of the ground bar will permit connection to the

transformer ground pad with the 1/2-13 bolt assembly supplied

with the switchgear equipment. If an optional floor plate is supplied

for the transition compartment, it will be necessary to remove the

floor plate to permit relocation of the ground connection bar.

Ground bus

connection

Advertising