Chapter 4. Equipment Installation

29

©2012 General Electric All Rights Reserved

The floor channels under the front and rear switchgear anchor

points (see Fig. 4-2) should be embedded in a level concrete slab

with their top surfaces flush with the finished floor. It is essential

that these steel channels be level and aligned with each other prior

to final anchoring, to prevent distortion of the switchgear structure,

to assure proper mechanical and electrical connections between

shipping splits, and to

assure proper interfacing to other close-coupled equipment.

AKD-20 Switchgear and Load Center Substations are frequently

mounted on steel floors and/or structural steel in industrial

installations (such as a mezzanine) to minimize usage of production

floor space. Regardless of the type of mounting surface, the

requirements for a smooth level surface remain.

Fig 4-2. Indoor enclosure - location of equipment anchor points

If studs or anchor bolts are to be used, they should be installed in

the foundation as it is poured. It is important that the studs or bolts

are spaced to agree with dimensions given on the General Electric

job drawings. The dimensions between anchor bolts for a particular

installation are dependent upon the configuration of equipment

ordered. The dimensions shown on Fig. 4-2 cover all of the

standard enclosures available for AKD-20 Switchgear.

Figure 4-3 illustrates the space available for conduit and/or cable

entrance through the bottom or top of each equipment section. The

space required for control wiring entry to the optional wiring trough

is also shown.