Tweco 30 O2 Auto-Cut Manuel d'utilisation

Page 66

Advertising
background image

Manual No. 0-4818 Auto-Cut 300

2

3-42

INSTALLATION

RETURN

SUPPLY

RETURN

SUPPLY

Art # A-04803

COOLANT

Fill Range

Coolant Tank

2. After the complete system has been installed, check that the coolant has been pumped through the

system as follows (see NOTE):

NOTE

Depending on the length of the torch leads, the system may require more coolant after turning the
system ON for the first time.

a. Place the ON/OFF Switch to ON.

b. After about 30 seconds the system may shut down if the leads are not full of coolant.

c. Place the ON/OFF switch to OFF.

d. After 10 seconds place the ON/OFF switch to ON again.

e. Repeat steps ‘b’ through ‘d’ until the system no longer shuts down. Depending on the length of the torch

leads this sequence may need to be done three to five times.

f. After the system stays operational allow the pump to operate for ten minutes to properly purge any air

from the coolant lines before using the system.

Advertising