Complete the installation – Tweco 300 Auto-Cut Manuel d'utilisation
Page 50
Advertising

Manual No. 0-4817 Auto-Cut 300
3-26
INSTALLATION
Complete the Installation
1. Fill the coolant tank to the level shown, with Thermal Dynamics coolant. The coolant level is visible through the
translucent coolant tank. The amount of coolant required varies with torch leads length.
2. Replace the cap on the tank.
Cat. Number and Mixture
Mixture
Protects To
7-3580 'Extra-Cool
TM
'
25 / 75
10° F / -12° C
7-3581 'Ultra-Cool
TM
'
50 / 50
27° F / -33° C
7-3582 'Extreme Cool
T M
'
Concentrate*
-65° F / -51° C
Coolant Capabilities
* For mixing with D-I Cool
TM
7-3583
RETURN
SUPPLY
RETURN
SUPPLY
Art # A-04803
COOLANT
Fill Range
Coolant Tank
2. After the complete system has been installed, check that the coolant has been pumped through the system as
follows (see NOTE):
Advertising