Tweco 300 Auto-Cut Manuel d'utilisation

Page 42

Advertising
background image

Manual No. 0-4817 Auto-Cut 300

3-18

INSTALLATION

3.13 Connect Torch Leads to the Gas Control Module / Arc Starter

1. Remove the top cover from the Gas Control Module / Arc Starter.

2. Pass the torch leads and coolant leads through the torch leads port on the back of the module. Ensure that the

leads outer jacket slides into the port.

CAUTION

Use protective gloves when handling the leads. Do not kink or bend the leads.

3. Inside the module, slide the leads clamp over the leads.

4. Connect the leads to the module in the sequence shown. Coolant leads and connectors are color-tagged; red for

coolant return, green for coolant supply. Shield gas and plasma gas connections are left- and right- hand
threaded and will not interchange.

Clamp * (Clamp type may vary)

Art # A-04934_AB

2

3

1

Inner Shield Lead
Connection Detail

4

CAUTION:

Keep two terminals

arranged as shown.

2

Torch Leads: Coolant Supply & Return
Plasma Gas
Shield Gas
Inner Leads Shield (Older Leads ONLY)
Outer Leads Shield

Older leads
ONLY

Advertising