Installation continued – Garland G2000 SERIES GAS BAKE AND ROAST DECK OVENS Manuel d'utilisation

Page 7

Advertising
background image

Part # P125 Rev 2 (07/31/12)

Page 7

D. Obtain a pressure regulator to deliver gas at the pressure

shown on the rating plate. This unit is supplied with a

pressure regulator.

NOTE: When checking pressure be sure that all other

equipment on the same gas line is on. A pressure regulator

is supplied with GARLAND equipped. Set regulator to deliver

gas at pressure shown on rating plate. Installation must

conform with the national Fuel Gas Code ANSI Z223.1-Latest

Edition/NFPA No. 54-Latest Edition and/or local code to

assure safe and efficient operation.

NOTE: In Canada, the installation shall be in accordance

with CAN/CGA-B149.1 NATURAL GAS INSTALLATION CODE

or CAN/CGA-B149.2 PROPANE GAS INSTALLATION CODE and

local codes where applicable.

NOTE: The appliance and its individual shut-off (supplied by

others) must be disconnected from the gas supply piping

system during any pressure testing of that system at test

pressures in excess of 1/2 PSI (3.45kPa).

The appliance must be isolated from the gas supply piping

by closing its individual manual shut-off (supplied by others)

during any pressure testing of the gas supply piping system

at test pressures equal to or less than 1/2 PSI (3.45 kPa).

NOTE: Adequate clearance must be provided for servicing

and proper operation.

Legs

Raise the front of the oven. Position the legs inside the front

corners of the angle from frame. Start each bolt, threading

them into the weld nuts on the angle base frame. Four (4)

bolts and four (4) washers must be used to secure each leg in

place. Tighten the bolts evenly and securely. Raise and block

the rear of the oven and fasten the rear legs as above.

Assembly of Two-Section Oven

Before raising the upper section into its proper position,

check at the rear centre of the underside of the upper section

(as per drawing). The rectangular flue opening should be

open. If the flue opening is covered, remove the “Bottom Flue

cover Patch” and discard.

Bottom Flue

Cover Patch

Be sure that the top trim cap (stainless steel angle iron square

frame) is not installed on the lower or middle ovens. Place

2 x 4’s on the top of the lower or middle ovens. Place

2 x 4’s on the top of the lower oven section – about 6” in from

each side, running front to back. Raise the top section and

position it on the 2 x 4’s so that the front, rear and sides of the

top section line up with the lower section. The internal upper

flue will telescope over the internal lower flue.

The upper oven section bottom frame will telescope or

capture the bottom unit. It is not necessary to bolt the

section together.

Installation of Oven Vent

1. The most efficient system for ventilating this oven is

a properly designed hood. This hood should extend

6 inches beyond the front and sides of the oven and

the back, unless oven is against a fire resistive wall. The

design of the hood should be such that it will not pull the

heat too rapidly out of the oven through the flue.

INSTALLATION Continued

Advertising