Checks to be performed following initial startup, 7 checks to be performed following initial startup – MaxPower Corp Gamatronic Power+ M100 Manuel d'utilisation

Page 46

Advertising
background image

Gamatronic Electronic Industries Ltd.

38

POWER+ 3x208 V, User Guide, Release 2.1

13.

Finally the normal default screen is displayed. Verify that the correct
number of phases are displayed:

for 3-3 configuration, under the LOAD LEVEL heading, you should see

a line for L1, L2, and L3 as in Figure 5-12.

For 3-2 or 2-2 configuration you should lines for L1 and L2 only, as in

Figure 5-14.

Figure 5-12: Default screen, with no load, for 3-phase output

Figure 5-13: Default screen, with no load, for 2-phase output


14.

Switch all battery switches "ON" on all battery cabinets.

15.

You can now turn on the load devices.

16.

After turning on the load devices, verify that you have a normal reading
on the display screen.

For 3-3 configuration, the display shows readings for L1, L2, and L3 as

in Figure 5-14 below, but of course your readings will be different.

For 3-2 and 2-2 configuration, the display shows readings for L1 and L2

only, as in Figure 5-15.

Figure 5-14: Normal display, system under load (3-phase output)

Figure 5-15: Normal display, system under load (2-phase output)

5.7 Checks to be performed following initial startup

TYPE OF CHECK

REQUIREMENT

RESULT

Advertising