Gamatronic Electronic Industries Ltd.

POWER+ 3x208 V, User Guide, Release 2.1

19

4.1 Preparation

1.

Prepare the proper infrastructure for the POWER+ with adequate cables
and connections.

2.

Prepare the POWER+ for installation. Ensure all components and
modules are complete and securely fastened to their shelves.

3.

Verify that utility ac power is disconnected, that the battery is
disconnected, and that all switches are OFF.

4.

If you have installed a maintenance bypass switch for your system,
ensure that the maintenance bypass switch is set to NORMAL (OFF).

5.

Connect the ac lines to the POWER+ AC INPUT terminals.
Do not

connect the ac lines to the bypass input at this time.

Do not

connect any lines to the UPS output terminals or to the UPS

battery

terminals at this time.

6.

Turn on the ac input circuit breakers.

7.

Wait for the UPS to power up. The power-up process takes about a
minute and 15 seconds. Several different screens are displayed on the
UPS LCD panel during the power-up process. When you see the default,
“Load Level” screen (see Figure 4-3 below), the power-up process has
completed.

Figure 4-3: System default display, after preparatory power-up