Chapter 3- Splicing the Switchboard
1111
SSpplliicciinngg tthhee SSw
wiittcchhbbooaarrdd SSeeccttiioonnss
These splicing instructions apply:
-
For individually mounted main/feeder, utility or incoming
lug pull sections to individually mounted main/feeder, utility
or incoming lug pull sections
- For individually mounted main/feeder, utility, or incoming
lug pull sections to group-mounted distribution sections
Align the sections according to the drawings furnished by
the supplier for the particular installation.
SSttrraaiigghhtt SSpplliicceess
To connect the splices first remove the ½”-13 bolt and
washers from the left hand connection as shown in Figure
12. Rotate each phase splice counterclockwise as shown in
Figures 13 and 14, starting with the rear most splice working
forward. With all splices for a specific phase in position, as
shown in Figure 15, insert the previously removed ½”-13
bolt and washers on each phase and torque accordingly.
Refer to
Table 1 for torque values. See Figures 16 – 23 for
additional information based on bus ampacity.
SSpplliiccee D
Diiaaggrraam
mss
Use the diagrams of Figures 12–21 for individually mounted
main/feeder, utility or incoming lug pull sections to
individually mounted main/feeder or utility sections. The
diagrams are divided into the following types:
Figures 12-15 Straight splicing
Figures 16–23 Main bus splice
Figures 24–29 Offset main bus splice
Figures 30–32 Neutral bus splice
Figure 33-38 Neutral offset bus splice
Figure 39
Ground bus splice