Installation – Controlled Products Systems Group BX-243C Manuel d'utilisation

Page 11

Advertising
background image

10

INSTALLATION

PREPARE AND INSTALL THE MOUNTING

PLATE

7

Position the mounting plate on top of the grid (Figure 4). Conduit must be run

through separate knockouts.

8

Position the mounting plate relative to the gate (Figure 5).

9

Fill the form box with concrete and wait for at least 24 hours to allow the

concrete to cure (Figure 6).

10

Remove the form box (Figure 7).

11

Fill the hole around the concrete form with soil (Figure 7).

12

Remove the nuts and washers from the bolts (Figure 7). The mounting plate

must be clean, perfectly level and with the bolt threads completely above the

surface.

For model BX243C (Chain) proceed to page 11.
For model BX243R proceed to page 14.

1.97”

2.17”

PREPARE AND INSTALL THE MOUNTING PLATE

FIGURE 5

FIGURE 4

FIGURE 6

FIGURE 7

3.54”

1.97”

4.13”

MODEL BX243C

MODEL BX243R

Advertising
Ce manuel est liée aux produits suivants: