INSTALLATION

PREPARE AND INSTALL THE MOUNTING

PLATE

The instructions and illustrations in this manual are examples ONLY. Your installation

may vary depending on space, obstructions, and accessories. It is up to the installer

to select the most suitable solution.

1

Dig a hole to the side of the gate (Figure 1). The concrete pad should be

deeper than the frost line. Check all national and local codes.

2

Prepare a trench and install the electrical conduit. All conduit should be 3/4"

diameter maximum.

NOTE: The number of conduits will depend on your site and the accessories to

be installed.

3

Prepare a form box larger than the mounting plate and insert the form box in

the hole (Figure 2). The form box should be 1-3/4” (50 mm) above the

ground (Figure 2).

4

Insert an iron grid inside the form to reinforce the concrete (Figure 2).

5

Insert the bolts into the holes of the mounting plate and secure with nuts and

washers supplied (Figure 3).

6

Extend the preformed tabs on the mounting plate with a screwdriver or a pair

of pliers (Figure 3).

1-3/4" (50 mm)

PREPARE AND INSTALL THE MOUNTING PLATE

FIGURE 1

1.57" (3.98 cm)

9.44"

(23.97 cm)

15.74"

(39.97 cm)

12" (30.47 cm)

Junction Box

Electrical conduit

FIGURE 2

FIGURE 3

• To AVOID damaging gas, power or other underground utility lines, contact

underground utility locating companies BEFORE digging more than 18 inches

(46 cm) deep.