Venting (Figures 7 and 8)

This unit is vented directly out the back using the concentric vent

tube assembly provided. See Figure 2 for vent hole location. This

hole location can be conveniently moved closer to unit exhaust

outlet tube to avoid wall stud interference if necessary. The orange

silicone exhaust elbow would need to be cut to length. Do not locate

vent directly behind the exhaust outlet.
The vent provided will accommodate walls up to 10" thick and

can be cut shorter for thinner walls if desired by using a hacksaw

or cut-off saw. Be sure to leave the minimum 3/4" of tube length

extending beyond the outside wall plate. Both the inner and outer

tube will be cut to the same length as the inner exhaust tube has an

extension piece which is added during final outside assembly.
Be sure to deburr the ends with a file after cutting. Installation is

easy after cutting the wall opening secure the vent terminal box

in place using the (4) 10 x 1" hex-head screws provided. Locate

the box so that the middle exhaust tube is directed toward the

furnace exhaust outlet opening. See Figure 8. Attach the black 2"

flexible inlet air hose to the bottom 2" connector on the vent box

using a hose clamp. Secure the other end to the lower inlet air

box connector using the hose clamp. Do not kink hose. Attach the

long straight end of the 2" orange silicone exhaust elbow to the

middle vent terminal tube and rotate the elbow toward the furnace

exhaust outlet. Secure the hose to the vent box using a hose clamp.

Carefully push the furnace back closer to the wall and secure the

exhaust elbow to the 2" exhaust tube exiting the unit. Secure the

elbow in place using the last remaining hose clamp. The furnace

can now be secured to the wall.
For wall depths thicker than 10" (254mm) order the extended vent

terminal kit which will cover walls to 32" (813mm) thickness.

The vent pipes must be cut to length to assemble for desired

wall thickness. Do not extend venting beyond the 32" maximum

length.
Installation of Shroud

To complete inside installation, secure furnace to the wall bracket

by attaching the two wall mounting brackets to the wall bracket by

using (2) 10 x 1/2" (13mm) hex-head screws provided (See Figures

4 and 6). To attach the right shroud and left shroud to the casing

back, the 3/4" wide flange on the shroud must be positioned toward

the casing side. When positioned correctly, the (6) louvers on the

shroud will be facing up and the knock-out on the shroud will be

facing down. Attach the right shroud and left shroud to the casing

back with (3) 10 x 1/2" hex-head screws supplied in hardware

package, for each shroud. Attach top shroud to right shroud and

left shroud with (4) Phillips-head screws, supplied in hardware

package. Insert air filter into top shroud.
Attention: If the right shroud and left shroud are installed incorrectly,

with the 3/4" wide flanges facing inward, the top shroud will not

be able to be installed onto the side shrouds. The top shroud will

appear to be 2 inches, too narrow.

Vent Terminal (Figure 9)

Place the 6 3/8" x 6 3/8" (162mm x 162mm) black foam, wall plate

gasket within the mounting plate. The 4 3/4" (121mm) diameter

hole in the black foam gasket will allow for installation of the

concentric vent tube assembly. Slide the outside mounting plate into

place on the concentric vent tube assembly. The outside mounting

plate should seal against the face of the building and be secured

in place using (4) 10 x 1" hex-head screws. Be sure to caulk and

seal around the pipe on the exterior using high temperature exterior

grade, silicone caulk rated at 204°C/400°F. Wipe some silicone

sealant on the 2" (51mm) exhaust pipe extension. The end cap can

be pushed into place on the exhaust outlet tube.
Attention: The opening on the bottom of the end cap must be

positioned toward the ground. The opening on the bottom cannot

be pivoted to the right or left, it must be centered toward the

ground.

Figure 9

Reassembly and Resealing Vent-Air Intake System

When vent-air intake system is removed for servicing the furnace,

the following steps will assure proper reassembly and resealing

of the vent-air intake assembly. Be sure all hose connections are

re-secured in place using the hose clamps removed. Reattach all

screws securing mounting flanges and inspect all connections for a

tight fit. Use high temperature silicone caulk rated at 204°C/400°F

to reseal the inlet air vent pipe to the mounting plate.

NO. 10 X 1 1/2"

SCREWS (4)

INLET AIR

EXHAUST

AIR

12"(305mm)MIN.

ABOVE GRADE

CAULK AROUND PIPE

EXHAUST FITTING-SLIDE ONTO

2" EXHAUST TUBE AND USE RTV

SEALANT TO SECURE IN PLACE

WITH OUTLET POINTED DOWN

AS SHOWN