4.01 Introduction

This Section provides a description of the Power Supply
operating controls and procedures. Identification of the
Front and Rear Panel components is followed by operat-
ing procedures.

4.02 Operating Controls

This subsection provides specfic functional descriptions
of the Power Supply operating controls and indicators.

A. Front and Side Panel

1. Control Panel

All operator controls, except gas pressure adjustment,
are located on this panel. Power ON/OFF and RUN/
SET/LATCH switches; CURRENT control; indicators
for AC Power, TEMP, GAS, and DC.

1

2

3

4

A-02748

Figure 4-1 Front and Side Panel Connections

2. Access Panel

A panel for access to the bulkhead area containing
the torch connections.

3. Torch Leads Input

Hole in the front panel to feed the torch leads through
to the internal bulkhead connections.

4. Work Cable and Ring Terminal

Work cable with ring terminal (factory installed) for
connecting to work table.

B. Control Panel

A

CURRENT

15

20

25

30

35

60

55

50

45

40

TEMP

AC

GAS

DC

LATCH

SET

RUN

ON

OFF

1

2

3

5

6 7

A-02456

4

or

A

A-03625

15

40

60

1

2

3

4

5

6

7

Figure 4-2 Operating Controls

1. Current Control (A)

Adjustment to set the desired output current between
15 to 60 amps. The unit has an automatic fold-back
circuit that limits current to 35 amps if torch tip con-
tacts the workpiece.

2. ON /OFF

Power Switch

ON position supplies AC power to activate all sys-
tem control circuits. OFF position deactivates con-
trol circuits.

Advertising