Tweco 100 Auto-Cut Manuel d'utilisation

Page 45

Advertising
background image

Manual 0-4764

3-21 INSTALLATION

NOTE

Depending on the length of the torch leads, the system may require more coolant after turning the system ON

for the first time.

a. Place the ON/OFF Switch to ON. The power supply will start to circulate coolant throughout the

system.

b. After about 30 seconds the system may shut down if the leads are not full of coolant.

c. Place the ON/OFF switch to OFF.

d. After 10 seconds place the ON/OFF switch to ON again.

e. Repeat steps ‘b’ through ‘d’ until the system no longer shuts down. Depending on the length of the

torch leads this sequence may need to be done three to five times.

f. After the system stays operational allow the pump to operate for ten minutes to properly purge any

air from the coolant lines before using the system.

3. Re-fill the reservoir and re-install the filler cap.

NOTE

Circuitry in the power supply will generate a ‘Low coolant’ message if the coolant level is too low.

Advertising