Installation continued – Garland E20 SERIES ELECTRIC UNITS Manuel d'utilisation

Page 5

Advertising
background image

Part # P66 (01/25/08)

Page 5

1. Level each unit by adjusting leveling bolts or legs. Use a

spirit level and level unit four ways; across front and back
and down left and right edges. Level all other units to the
first unit, securing each unit to the adjacent unit.

NOTE: Griddles may not rest evenly on the unit body, if
units are not leveled.

2. Remove upper front panel, by removing the acorn nuts

on each side of the panel.

3. Place the banking plate in position, over the two bolts

located in the main sides below the panel mounting
brackets.

NOTE: Install recessed (stepped) centre portion of
banking plate tight to the main sides of the units being
banked. Secure in place with two hex nuts supplied.

4. Replace and secure upper front panels.

CS22 Counter Stand Installation

1. Assemble and level counter stand as illustrated in the

instructions found in the counter stand carton.

2. Remove and discard leveling blots on the unit to be

install on the counter stand.

3. Place units in desired position on the counter stand,

securing the first unit with the 3/8-16 machine screws
and flat washers supplied with the counter stand. Insert
3/8-16 machine screws through the 9/16” (14mm)
diameter holes in stand into the leveling bolt weld nuts.

4. Connect banking plates as described in E22 Series

Installation of Banking Plates.

5. Secure last until to the counter stand with the 3/8-16

machine screws and flat washers supplied with the
counter stand. Insert 3/8-16 machine screws through the
9/16” (14mm) diameter holes in stand into the leveling
bold weld nuts.

CS24 Counter Stand Installation

1. Assemble and level counter stand as illustrated in the

instructions found in the counter stand carton.

2. Remove and discard leveling bolts on unit to be installed

on the counter stand.

3. Remove the front and rear sheet metal screws in the main

bottom of units to be placed on the outer sides of the
stand.

4. Place units in desired position on the counter stand,

securing the first unit with sheet metal screws removed in
paragraph 3. Insert sheet metal screws through the 9/32”
(7 mm) diameter holes in the stand into hole from which
the sheet metal screws were removed.

5. Connect banking plates as described in E24 Series

Installation Of Banking Plates.

6. Secure last unit to the counter stand with sheet metal

screws removed in paragraph 3. Insert sheet metal
screws through the 9/32” (7 mm) diameter holes in stand,
into the holes from which the sheet metal screws were
removed.

Fryers – Model E22-14F & E22-28FT

Serial Plate Location

The serial plate is located on inside of the main back, to
access remove fryer tank.

Wall Clearances

Do not install closer to a wall of combustible material than:

Sides

1/2” (13mm)

Back

1/2” (13mm)

Electrical Connection

For supply connection, use wire suitable for 75°C (167°F).

Electrical connection may be made though the knockout at
the rear of the unit in the terminal box located on the inside
of the rear of the unit. Access to the terminal box is gained
by removing the 10-24 machine screw and 10-24 hex nut
securing the terminal box cover to the terminal box.

To remove the fryer tank, raise the heating unit by means of
the handle until lock stop drops, holding the heating unit in
the upright position. The heating unit is lowered by moving
the lock stop to release the unit form the upright position.

Initial Operation

1. Before leaving the factory, the fryer was tested and the

thermostat calibrated with oil in the fry tank; therefore, it
is necessary to clean the fry tank before filling with frying
compound. Use detergent or other cleaning agents, with
hot water. Thoroughly rinse and dry fry tank. Fryer is now
ready to be filled.

2. If liquid frying compound is used, fill the tank to the ribs

stamped in the tank sides. Turn the thermostat to the
desired frying temperature.

INSTALLATION continued

Advertising