John Wood Commercial Power Vent - AJWSM Manuel d'utilisation

Page 5

Advertising
background image

4

For Power Vent Kit GPAK1T-GSW
1. Attach the enclosed VH1-4 template on Page 10 to interior of the wall the Vent Hood will be penetrating. Verify that wall penetra-

tion will not come in contact with concealed wiring or plumbing. Using a 1/2” drill bit, drill two pilot holes where noted on the tem-
plate. The drill bit must be long enough to penetrate to the building exterior.

2. Using a reciprocating saw, cut a hole through the building siding, wall board, etc., following the appropriate lines of the template.
3. Slide the Vent Hood through the opening and fasten to exterior wall using screws provided.
4. Once Power Venter and vent pipe are completely installed and secured, apply a bead of caulk between the Vent Hood flange and

exterior of building.

For Power Vent Kit GPAK2T-GSW
1. Use inside wall cover plate as a template to mark a hole at termination point on the wall. Cut hole 1/2” larger than cover plate to

facilitate installation. Verify that wall penetration will not come in contact with concealed wiring or plumbing.

2. Using a 1/2” drill bit, drill two pilot holes. The drill bit must be long enough to penetrate to the building exterior. Using a reciprocat-

ing saw, cut a hole through the building siding, wall board, etc.

3. Slide Vent Hood through opening. Fasten to exterior wall using screws provided.
4. Install cover plate and fasten to the inside wall with four screws.
5. Once Power Venter and vent pipe are completely installed and secured, apply a bead of caulk between the Vent Hood flange and

exterior of building.

CODE REQUIREMENTS

The Power Venter installation must be done in accordance with the following requirements of the latest edition of the “Natural Gas
and Propane Installation Code, CAN/CSA-B149.1”
or the “National Fuel Gas Code, ANSI Z223.1 (NFPA 54)”:

• All portions of the vent system under positive pressure during operation (on the outlet side of Power Venter) shall be designed and

installed so as to prevent leakage of flue or vent gases into the building,

• All appliances must enter the vent system on the inlet side of the Power Venter,

• Provision shall be made to interlock the appliance(s) to prevent the flow of gas to the main burners when the draft system is not

performing so as to satisfy the operating requirements of the equipment for safe performance. See “Electrical Wiring” section of
this manual for details.

Rough-In Dimensions
VH1-4 8”

Square

VH1-6

9” Round

DIMENSIONS

VENT HOOD INSTALLATION

VENT HOOD INSTALLATION

POWER VENTER INSTALLATION

CAUTION

Failure to follow these installation instructions may violate applicable national and/or local codes.

• The vent system must terminate so proper clearances are maintained as specified in “Vent Hood Location” in these

instructions.

• A vent system incorporating a VH1 Series Vent Hood should not exceed 550°F.

• Plan the vent system layout to avoid the possibility of accidental contact with concealed wiring or plumbing inside walls.

Advertising
Ce manuel est liée aux produits suivants: