UPS SYSTEM INSTALLATION

EATON Powerware

®

9395 UPS (1000–1100 kVA) Installation and Operation Manual

S 164201764 Rev 1 www.powerware.com

4−39

Distributed Bypass Installation Checklist

- Each cabinet in the distributed bypass system is placed in its installed location.

- All conduits and cables are properly routed to the UPS cabinets and to the tie cabinet or distribution panel.

- All power cables are properly sized and terminated.

- Neutral conductors are installed or bonded to ground as per requirements.

- A ground conductor is properly installed.

- Controller Area Network (CAN) wiring between the UPS cabinets is properly installed.

- Pull−chain wiring between the UPS cabinets is properly installed.

- Adequate workspace exists around the UPS cabinets, the tie cabinet, and other cabinets.

- Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.