Conduit sizes were chosen from NEC Table 4, Electrical Metallic Tubing (EMT). See
Table 3-13 for conduit requirements.

Per NEC article 300, 3(B)(1), all three-phase conductors must be run in the same
conduit. Neutral and ground must be run in the same conduit as the phase
conductors.

Conduit is sized to accommodate one neutral conductor the same size as the phase
conductor and one ground conductor sized in accordance with NEC Table 250.122.

Conduit sizes listed are for copper wiring only.

Table 3-13. Power Cable Conduit Requirements

UPS Model

Voltage

Terminal

Number of Wires

in Conduit

Minimum Conduit

Trade Size

Number of

Conduits

Powerware 9395−1100/1000

480 Vac

AC Input to UPS Rectifier

(A, B, C, Ground)

4

3

5

AC Input to Bypass and Output (Four Wire)

(A, B, C, Ground)

4

3

4

AC Input to Bypass and Output (Five Wire)

(A, B, C, Neutral, Ground)

5

3

5

DC

Battery

(Positive, Negative, Ground)

See Note

Powerware 9395−1100/1100

480 Vac

AC Input to UPS Rectifier

(A, B, C, Ground)

4

3

5

AC Input to Bypass and Output (Four Wire)

(A, B, C, Ground)

4

3

5

AC Input to Bypass and Output (Five Wire)

(A, B, C, Neutral, Ground)

5

3-1/2

6

DC

Battery

(Positive, Negative, Ground)

See Note

Powerware 9395−1100/650
Powerware 9395−1100/750
Powerware 9395−1100/825

480 Vac

AC Input to UPS Rectifier

(A, B, C, Ground)

4

3

4

AC Input to Bypass and Output (Four Wire)

(A, B, C, Ground)

4

3

4

AC Input to Bypass and Output (Five Wire)

(A, B, C, Neutral, Ground)

5

3

5

DC

Battery

(Positive, Negative, Ground)

See Note

NOTE Select conduit taking into consideration the DC input wire sizes listed in Table 3-4, Table 3-5, Table 3-6, or Table 3-7 starting on page 3−9, the DC