Setup and installation – Belkin AP51300fc10-BLK Manuel d'utilisation

Page 28

Advertising
background image

B

elkin

Pur
eA
V

Hybrid

A

VU1500

UP
S

25

Setup and Installation

Power Planning:
Now, begin planning which device should connect to which AVU1500 power
outlet. Here is a sample planner:

Shutdown
Stage:

Stage 3

Stage 2

Stage 1

Filter Bank:

A - digital

B - analog

C - analog

D – high

current

Switched vs.
Always On?

Always on

Switched

no delay

Always on

Switched

10 sec.

delay

Outlets

DVR

Projection

TV

VCR

Preamp

Amplifier

Outlets

Satellite

box

PC

Tape

player

Game

console

DVD

DVD

Use the empty planner below to assign your home theater components to
your AVU1500 power outlets (write in pencil) and decide if the associated
filter banks will be “always on” or “switched”.

Shutdown Stage:

Stage 3

Stage 2

Stage 1

Filter Bank:

A - digital

B

– analog

C - digital

D – high

current

Switched vs.
Always On?

Outlets

Outlets

Considerations and Suggestions
As you begin to assign devices to power outlets, you may find yourself
having to move and reassign items a bit based on various considerations.
This is to be expected.
Amplifiers and subwoofers: Assign these to Stage 1 Filter

Bank D outlets.

These components draw a lot of power and in the event of a blackout,

they should be shut off first to conserve battery-backup power.

These components should be “switched” with a delayed power-on for

about 10 or 15 seconds.

Advertising
Ce manuel est liée aux produits suivants: