Blast Chillers 3185550 Manuel d'utilisation

Page 30

Advertising
background image

-

-

-

I

I

I

N

N

N

S

S

S

T

T

T

A

A

A

L

L

L

L

L

L

A

A

A

T

T

T

I

I

I

O

O

O

N

N

N

M

M

M

A

A

A

N

N

N

U

U

U

A

A

A

L

L

L

-

-

-

28

CONNECTION TO CONDENSATE DRAIN




On certain models, a condensation discharge 1.2” diameter hose
installation is necessary, ("SAREL" or any similar type). The
current general and local regulations pertaining to drains are to be
complied with. (pict.36)



The guarantee is voided and the Manufacturer will not be liable for any damage to appliances or
operators arising from the non-compliance with and tamperings to any part of the appliance
(electric, thermodynamic or hydraulic plant).

TESTING


Carry out the following checkings:

1) Ambient temperatures must be between 50[°F] and 90[°F].
2) Check power input.
3) Carry out at least one full quick cooling cycle

If the appliance was transported horizontally instead of a vertical position DO NOT START THE
APPLIANCE IMMEDIATELY. WAIT FOR AT LEAST 4 HOURS BEFORE OPERATING.

Pict.36

Advertising
Ce manuel est liée aux produits suivants: