Installing Additional Service Fixtures

Additional service fixtures can be installed in the available service fixture holes in
both sidewalls and corner posts. The fume hood is factory set to accept up to four
valves per side. Contact Labconco Customer Service for information.








Installing Guardian™ Digital Airflow

Monitor or Guardian™ Airflow Monitor

The Guardian Airflow Monitors continuously monitor face velocity through the
fume hood opening. The fume hood right corner post is factory prepared to
mount either monitor. Contact Labconco Customer Service to order.

Distillation Grids – Field Installation

The distillation grids have been strategically placed with the vertical rod center
lines in front of the lower baffle and middle baffle. The distillation grids allow
the hood user to mount glassware, motors, stirrers, and other apparatus (not
available on Pass-Through Fume Hood). Contact Labconco Customer Service for
ordering information for Floor-Mounted Hoods.