Labconco Protector XL Floor-Mounted (Walk-In) Laboratory Fume Hoods 1128 Series Manuel d'utilisation

Page 18

Advertising
background image

Chapter 3: Getting Started

Product Service 1-800-522-7658

14

Original instructions

Upper Cabinet Installation of the

Protector XL Floor-Mounted Hood

Remove the upper cabinet assembly side panels and front panels prior to cabinet
placement. Then place the upper cabinet assembly on top of the lower base
assembly, being careful to clear the lower base assembly during placement. To
prevent spillage from seeping between the two liner assemblies, run a bead of
white RTV sealant between the sections once they have been properly aligned.
Mount the lower base to the upper cabinet using the ¼-20 hex head screws,
lockwashers, and nuts included in your hood package. See Figure 3-2.

































Figure 3-1

Upper Cabinet Assy.

Lower Base Assy.

Rear Vertical
Lower Sash with
inner wide weight

Front Vertical
Upper Sash with
Outer Weights

Apply bead of RTV
at inner joint.

Advertising