Radson Vido Manuel d'utilisation

Page 9

Advertising
background image

09

8.0 Water Connection

(continued...)

Ensure all water fittings are secure before filling the system.

Fill the system, open the valves fully and check pipe connections
for leaks and vent the heat exchanger.

Installations with chilled water will require provision for
condensate disposal in accordance with any local regulations.

A drain tray is fitted for condensate collection within the unit. This

should be connected to a 15mm drain pipe.

Alternatively a condensate disposal pump is available as an
accessory, e.g. for use on internal walls (see Section 15). This will
include the drain pipe.

Spiggot size
15mm O/D

Connecting tube
>15mm I/D

How to bleed/vent

Condensate drain connection

8.0

Advertising