Tools and materials needed for installation, Assembly – United States Stove Company 3000 (L) Manuel d'utilisation

Page 5

Advertising
background image

Ussc

5

Tools and Materials Needed For Installation

You will need a drill with a 1/8” bit to install sheet metal screws into connector pipe. A 5/16” socket/wrench or screw driver

to install pedestal trim, room air deflector, and blower assembly described below. A 1/2” socket/wrench to install flue

collar. A non-combustible floor protector as specified in this manual. All chimney and chimney connector components

required for your particular chimney installation.

Assembly

Flue Collar Assembly:

1. Mount the flue collar to the top of the unit as shown using the (3) 5/16-18 x 1-1/2 bolts, (3) washers, and (3) weld

tabs provided in the parts box.

Room Air Deflector Assembly:

1. Locate the Room Air Deflector. Using the three(3) 1/2 Tek Screws provided, mount the deflector to the unit as

shown in the diagram.

Firebrick Configuration:

1. Replace the Firebrick as shown in the illustration below.

Side view of flue collar

mount to heater top

Brick Configuration

HEATER

TOP

WELD

TAB

5/16-18 x 1-1/2

BOLT

Advertising
Ce manuel est liée aux produits suivants: