Hapter, Rerequisites, Location requirements – Labconco Intelli-Sense Multi-Speed Blowers 7183413 Manuel d'utilisation

Page 9

Advertising
background image

Product Service 1-800-522-7658

5









C

HAPTER

2

P

REREQUISITES

Before you install your blower, you need to prepare your site for installation. A
dedicated source of electrical power must be located near the installation site.

Carefully read this chapter to learn:

The location requirements for your installation site.

The mounting support requirements for your installation site.

The electrical power requirements for your installation site.

The fume hood controls, controls wiring, and controls modifications for

your installation site.

The space requirements for your installation site.


Refer to Appendix B: Blower Dimensions for complete blower dimensions.

Refer to Appendix C: Blower Environmental Conditions for complete
environmental conditions and wiring diagram.

Location Requirements


In positioning your blower, care should be taken to make sure that it is away from
all other types of air handling equipment (intake fans, air conditioning units, etc.).
Your blower should also include a minimum of 7 ft. of ducting above the roofline
to generate proper air dispersion of materials being exhausted through the blower.
Also consider the location of the blower inlet with respect to the hood you are
exhausting. Proper planning and layout are essential in selecting a blower
location.

Advertising