13 maintenance – Rinnai E110CP Manuel d'utilisation

Page 64

Advertising
background image

Installation & Servicing Instructions Rinnai E-Series

64

12.5 Installing the casing

- Install the cover on the boiler and close all 4 quick releases of the casing

- Tighten the 4 screws A,B,C and D in the quick releases (fi gure 30);

- Tighten the screw E behind the door on the front of the casing (fi gure 30);

13

Maintenance

Maintenance or changes to the boiler may only be carried out by a qualifi ed
technician.

13.1 Periodic examination of venting systems and boiler

The inspection of the boiler and venting system should be done every 2 years or
2000 hours and full maintenance every 4 years or 4000 hours of operation, whichever
occurs fi rst. When doing this the circumstances of the boiler’s location must be taken
into account. From this one can determine whether to deviate from this advice.
Please contact Rinnai for further guidance on the frequency and service
requirements. Contact details can be found on the back page of this manual.

13.2 Inspection

Preparing the boiler for inspection

To carry out the maintenance activities please follow the next procedure:
- Switch off the power supply;
- Shut off the gas;
- Valve off the boiler from the system using the boiler isolation valves in the plumbing

kit.

- Remove the 4 screws A,B,C and D in the quick releases of the casing (fi gure 31);
- Remove the screw E behind the door on the front of the casing (fi gure 31);
- Remove it towards the front.
- Clean the casing with a cloth with a simple (non-abrasive) cleaning agent;

NOTICE

i

NOTICE

i

Removing casing

fi gure 31

Installing casing fi gure 30

Advertising
Ce manuel est liée aux produits suivants: