Installation & Servicing Instructions Rinnai E-Series

16

clearances to the boiler

table 3

service clearances to the boiler

figure 4

wall

ceiling

For closet installation: clearance is 1” / 25mm from the front.

Low Loss Header

Clearances to combustible and non-Combustible is 0 inch for sides, top, front and fl oor/ground
The recommended service clearance to the bottom of the low loss header is 12 inches.

2"
50

Min. 10" /

250mm

15.7"
400

24"
600

5.3.2

Clearances from boiler

Minimum required clearances

to combustibles

Minimum required clearances

to non-combustibles

Recommended

service clearances

All types

All types

All types

inch / mm

inch / mm

inch / mm

Top of boiler

2" / 50

2" / 50

10" / 250

Back of boiler

0"

0"

0

Front of boiler

6" / 150

6" / 150

24" / 600

Left side of boiler

2" / 50

2" / 50

2" / 50

Right side of boiler

2" / 50

2" / 50

2" / 50

Floor / Ground to
bottom of boiler

12" / 300

12" / 300

30" / 762

Floor/ Ground to
bottom Low loss
header

0"

0"

12" / 300

Vent 0"

0"

0"

2"
50