Rinnai E110CP Manuel d'utilisation

Page 6

Advertising
background image

Installation & Servicing Instructions Rinnai E-Series

6

1.5 Follow these instructions for the space heating water

Unsuitable heating system water can cause the formation of scale or sludge, which
affects system effi ciency. It can also cause corrosion and reduce life of the heat
exchanger.

– You must follow Rinnai guidelines for boiler water quality.
– Thoroughly

fl ush the system prior to fi lling.

– Follow the Rinnai cleaning instructions.
– Never use water that has been treated by a reverse osmosis, D.I., or distilled water

to soften the water to fi ll the heating system.

– Do not use inhibitors or other additives unless approved by Rinnai for that purpose!
– When frost protection of the heating system is desired, only use Rinnai-approved

antifreezes. The allowed maximum concentration is 50%.

– When using oxygen-permeable pipes, e. g. for under fl oor heating systems, you

must separate the system from the boiler using plate heat exchangers.

– Valve off boiler while fl ushing system, do not introduce any system cleaner into the

boiler loop. Flush system thoroughly to remove all system cleaner before fi lling boiler.

Approved

antifreeze:

• Rhomar RhoGard Mutli-Metal (AL safe)

(max. concentration 50%) • Noble Noburst AL

Approved system cleaner: • Noble Noburst Hydronic System Cleaner

Fernox

F3

Cleaner

Rhomar

Hydro-Solv

9100

The system cleaners from NoBurst, Rhomar, and Fernox are not to be used in
the boiler. The boiler must be closed off (valved off) from the rest of the system
or not connected while the cleaners are in the system. The system should then
be drained and then thoroughly fl ushed with clean water to remove all the
system cleaner.

Approved inhibitors:

• Rhomar Pro-tek 922

Noble

Noburst

AL

inhibitor

See the Rinnai Boiler Applications Manual or Chapter 6 of this manual for additional
information.

If problems occur when using sanitary water with a chlorine content
higher than 150 mg/l, no recourse can be made to the terms of the warranty.

1.6 Tools, materials and additional equipment

For the installation and maintenance of the boiler you will need:
– Standard tools for space heating, gas and water fi tting
– Digital manometer, capable of reading both positive and negative pressure
– Combustion analyzer (intended for use with condensing boilers)
– Digital multimeter
– pH digital meter
– Metric Allen wrenches
– Metric socket wrenches
In addition, a handtruck with a fastening belt is useful.

For maintenance of the boiler you will need, apart from standard tools for space
heating, gas and water fi ttings the following items:
- Rinnai toolkit Q and E-Series

NOTICE

i

NOTICE

i

Advertising
Ce manuel est liée aux produits suivants: