Re-Configuration Process


Events in which you have to “Re-configure”

Installing or commissioning a GFH for the first time

Replacing a fan board or a complete fan box

Replacing an Electro/Acid Sensor

Replacing a solvent sensor

Replacing a RFID board

Replacing a CPU board

Replacing a complete control module

Sash sensor failure

Hardware Configuration mismatch 9A alarm


Before beginning, you will need to have the following:

Green Fume Hood Settings sheet (example provided on next page)

6ft Ladder

Any tools needed for removal of front panel

Some white out, or a small sticker to mark the round RFID tags that are on

the primary filters only (the primary filters are the lower ones that are in
between the lights & fan box)

Piece of paper and a pen

Maintenance card

The User card that is used to operate the hood you are going to re-configure