Tweco 1000 CE Merlin Manuel d'utilisation

Page 25

Advertising
background image

Manual 0-2731

3-7

INSTALLATION

3.07 Connecting Torch Leads To

System Without Optional
Remote Arc Starter

NOTE

For Systems using the Optional Remote Arc Starter
refer to Section 3.13 for connecting the Torch.

WARNING

Disconnect primary power at the source before as-
sembling or disassembling the power supply, torch
parts, or torch and leads assembly.

The Torch Leads must be properly installed to the Power
Supply for proper operation. Make all torch connections
to the Torch Bulkhead Panel as follows:

NOTE

Equipment ordered as a system will have the Torch
factory connected to the Power Supply.

CAUTION

This system is designed for use with the Maximizer
300 Torch only. Do not connect any other torch to
this power supply.

1. Open the Access Panel to gain access to the Torch

Bulkhead Panel.

2. Remove the hardware attached to the power sup-

ply end of the leads assembly with a tie wrap.

3. Feed the connector on the end of the CNC Control

Cable through the rubber boot on the front panel of
the Power Supply (see NOTE).

NOTE

Feed the Control Cable through the rubber boot first
as there will not be enough space inside the rubber
boot for the connector if the Coolant and Gas Leads
have been fed through the rubber boot first.

4. Connect the CNC Control Cable connector to the

Control Cable connector on the Torch Bulkhead
Panel.

5. Feed the end of the Torch Leads through the rub-

ber boot.

6. Refer to the illustration. The Leads Assembly in-

cludes two leads shields; each shield includes two
ring-tongue connectors. Connect the Torch Leads
Shield Wires as follows:

a. Remove one nut and star washer from the torch

leads shield stud on the Torch Bulkhead Panel.

b. Place the ring lugs from the inner (RED) Torch

Leads Shield Wires over the shield stud on the
Torch Bulkhead Panel.

c. Secure the wires with the nut and star washer.

d. Place the ring lugs from the outer (GREEN /

YELLOW) Torch Leads Shield Wires over the
shield stud on the power supply chassis.

e. Use the nut and star washer previously removed

from the torch leads assembly to secure the wires
to the shield stud on the power supply chassis.

Secondary

Gas

Plasma (+)

Gas

Control Cable

Connector

Coolant

Supply (-)

CNC Control

Cable

RED Shield Wires

With Ring Lugs

Torch Leads

Shield Stud

(for INNER Shields)

GREEN / YELLOW Shield

Wires with Ring Lugs

Torch Leads

Shield Stud

(for OUTER Shields)

Coolant

Return

Art # A-03997

Power
Supply
Chassis

Torch
Bulkhead
Panel

Figure 3-7 Shielded Machine Torch Connections

7. Connect torch coolant and gas leads to connectors on

the Torch Bulkhead Panel.

8. Close the Access Panel and turn the two latching

screws.

9. Check the torch for proper parts assembly.

10. Connect the other end of the CNC Control Cable to

the desired equipment.

Advertising