John Wood Noritz N-0931M_N-0931M-OD_N-0931M-DV Manuel d'utilisation

Page 10

Advertising
background image

10

Vent Clearances When Heater is In-

stalled Indoors

• 1.2m (4') below, 1.2m (4') horizontally from,

or 0.3m (1') above any door, operable win-
dow, or gravity air inlet into any building.
0.9m (3') above any forced air inlet within
3m (10').

Maintain the following clearances to any

opening in any building:

Illustration

(Noritz vent cap)

• 0.3m (1') below, 0.3m (1') horizontally from,

or 0.3m (1') above any door, operable
window, or gravity air inlet into any building.
0.9m (3') above any forced air inlet within
3m (10').

• For outdoor installation, use the outdoor

vent cap.
If it is necessary to vent above the roof line
in an outdoor installation, also use the base
of the vent cap for rain protection.

Vent Clearances When Heater is Installed

Outdoors With a Vent Cap

* All clearance requirements are in accordance with ANSI Z21.10.3 and the National Fuel Gas Code,

ANSI Z223.1 and in Canada, in accordance with NSCNGPIC.

* For Installations in Canada, clearances are as follows: To windows, doors, & gravity air inlets: 900mm (36").

To forced air inlets: 1.8m (6'). These clearance requirements hold true for all of the above situations: Indoor,
Outdoor w/vent cap.

0.9m (3')

0.3m (1')

1.2m (4')

1.2m (4')

Clearance Requirements from Vent Terminations to Building Openings

[ For N-0931M]

0.3m (1')

0.3m (1')

0.9m (3')

0.3m (1')

Advertising