Hapter, Rerequisites – Labconco Protector Pass-Through Laboratory Fume Hoods 1136 Series Manuel d'utilisation

Page 9

Advertising
background image

Product Service 1-800-522-7658

5

Original instructions











C

HAPTER

2

P

REREQUISITES

Before you install your laboratory fume hood, you need to prepare your site for
installation. Carefully examine the location where you intend to install your
hood. You must be certain that the area is level and of solid construction. In
addition, a dedicated source of electrical power must be located near the
installation site.

Carefully read this chapter to learn the requirements for your installation site:

The location requirements.

The support requirements.

The exhaust requirements.

The electrical power requirements.

The service line requirements.

The space requirements.


Refer to Appendix B: Protector Pass-Through Dimensions for complete fume
hood dimensions.

Refer to Appendix C: Protector Pass-Through Specifications for complete
laboratory fume hood electrical and environmental conditions, specifications and
requirements.

Advertising