Labconco Protector Pass-Through Laboratory Fume Hoods 1136 Series Manuel d'utilisation

Page 16

Advertising
background image

Chapter 3: Getting Started

Product Service 1-800-522-7658

12

Original instructions

Installing the Hood on a Supporting

Structure and Work Surface

The Protector Hood is heavy! Use caution when lifting or
moving the unit.

La Hotte Protecteur est lourd! Prudence en soulevant ou en
déplaçant l'objet.

!

When installing the Protector
Fume Hood onto a chemically-
resistant work surface or
benchtop, ensure that the
structure can safely support the
combined weight of the fume
hood and any related equipment.
The work surface should be at
least as wide as the hood to
properly support it. Position
front edge of fume hood 1.7"
past front edge of
worksurface. Lower base
cabinets or casework is
placed flush with front edge
of worksurface as shown in
Figure 3-2.

The work surface should be
smooth and durable, such as a
chemically-resistant epoxy
resin. The surface should be
nonporous and resistant to the
acids, solvents, and chemicals
used in conjunction with the
Protector Fume Hood. The
work surface should also
contain a dished recessed area
for containing primary spills.

Figure 3-2

33.4"

30.0"

1.7"

Both

Sides

35.8"

1.3"

59.0"

45.7"

26.5"

Advertising